Skip to content
MordeTech

Industrial automation & Industry 4.0 · Pune, India

Make every shift more predictable.

MordeTech combines control engineering, machine vision and plant data so manufacturers can see what their lines are doing — and reduce the defects, downtime and energy cost that follow from not knowing.

Siemens PLC & SCADA · AI vision inspection · OPC UA · MQTT · OEE · Predictive maintenance

What this costs you

Four problems that show up on the P&L

Every plant has these. The difference is whether you can see them early enough to act.

Quality escapes

A defect found at final inspection has already absorbed every operation after the one that caused it. Found at the customer, it costs the relationship as well.

Unplanned downtime

The stoppage itself is rarely the expensive part. It is the shift that cannot be recovered, the order that moves, and the overtime to catch up.

Fragmented plant data

Production numbers assembled by hand are disputed in the meeting. Time goes into agreeing what happened instead of deciding what to do.

Rising energy cost

Energy billed as one plant total cannot be attributed, so there is no way to tell an efficient line from a drifting one.

How it fits together

From machine signal to business result

Nothing here replaces your control system or your safety functions. It reads what the plant already knows and puts it where a decision gets made.

How plant data becomes a business result: sensors and instruments feed the PLC and SCADA layer, a secure data layer moves that data to analytics and AI, and the result becomes an action on the plant floor.
  1. 01

    Sensors & instruments

    Vibration, temperature, current, vision, flow — measured at the machine.

  2. 02

    PLC & SCADA

    Control executes. Siemens S7, WinCC, existing safety interlocks untouched.

  3. 03

    Secure data layer

    OPC UA and MQTT move data read-only to an edge gateway inside your network.

  4. 04

    Analytics & AI

    Historian, OEE calculation, condition models, vision inference at the edge.

  5. 05

    Action on the floor

    A reject diverted, a work order raised, a dashboard the shift meeting trusts.

Protocols: OPC UA · MQTT · Siemens S7 · Modbus TCP/RTU · Profinet & Profibus via gateway

How we work

Delivery method

Industrial projects fail at integration and adoption far more often than at engineering. The method is built around that.

  1. 01

    Discover

    Walk the floor, watch a shift, agree what the real constraint is before proposing anything.

  2. 02

    Engineer

    Design and build off-line. Logic, screens and models developed against an agreed specification.

  3. 03

    Integrate

    Install into the existing line. Safety functions reviewed separately and left intact.

  4. 04

    Validate

    Factory acceptance before shipment, site acceptance on your floor with your parts and operators.

  5. 05

    Support

    Training, documentation and source handed over. Support arrangements agreed, not assumed.

Next step

Find the largest opportunity in your plant.

A plant assessment is a structured walk of your line with your team: where quality is lost, where availability goes, and what data already exists. You get our read on the biggest opportunity, whether or not you engage us for the work.